Oil & Gas · Visakhapatnam, Andhra Pradesh · 2024
Refinery Expansion Pipe Racks
HPCL [PLACEHOLDER]
Challenge
Erecting 2.1 km of pipe rack through an operating refinery corridor with hot-work permits limited to 6-hour windows and zero tolerance for dropped objects over live lines.
Approach
Modularised the racks into 24 m pre-dressed units — piping, trays and fireproofing fitted in our yard — moved on SPMTs at night and set in single lifts, cutting site hot work by 70%.
Result
38,000 inch-dia of piping with a 0.4% weld repair rate; the corridor was energised on schedule and the client adopted our modular method as its standard for the next phase.
Spec Sheet
- Scope
- Fabrication, modularisation & erection of pipe racks + spools
- Tonnage
- 4,800 MT structures · 38,000 inch-dia piping
- Duration
- 14 months
- Contract type
- Lump-sum turnkey (structures package)
- Key equipment
- SPMT transport, 220 T telescopic cranes
- NDT
- 100% RT on Cat-1 piping welds