Cement · Solapur, Maharashtra · 2022
Cement Grinding Unit
UltraTech [PLACEHOLDER]
Challenge
A compressed 16-month first-dispatch target on a greenfield site with black-cotton soil demanding deep foundations under the mill and silo blocks.
Approach
Piled foundations ran round-the-clock in two rigs while the silo slipform crew mobilised early; the 52 m cement silo was slipformed in a continuous 21-day cycle.
Result
First cement dispatched 16 months from the first pile — the client's fastest grinding-unit build to date [PLACEHOLDER — confirm].
Spec Sheet
- Scope
- Civil + structural + equipment erection for grinding circuit
- Tonnage
- 3,200 MT steel · 28,000 m³ concrete
- Duration
- 16 months
- Contract type
- Composite works contract
- Key equipment
- Slipform rig, 150 T crawler crane
- Peak manpower
- 560