Pharma & Chemicals · Srikakulam, Andhra Pradesh · 2023
Process Vessel Package
Dr. Reddy's [PLACEHOLDER]
Challenge
Pharma-grade surface finish (Ra ≤ 0.4 µm internal) on 34 vessels with staggered delivery tied to a live plant commissioning sequence — any late vessel stalled an entire train.
Approach
Dedicated SS bay with segregated tooling to eliminate cross-contamination, electropolishing partner qualified in advance, and a vessel-by-vessel countdown board shared weekly with the client's commissioning team.
Result
All 34 vessels accepted with zero TPI punch points on final inspection; last vessel delivered 11 days ahead of the commissioning need date.
Spec Sheet
- Scope
- Design-assist fabrication of 34 pressure vessels & columns
- Material
- SS316L / SA516 Gr70, shells to 36 mm
- Duration
- 9 months
- Code
- ASME Sec VIII Div 1, U-stamp-equivalent documentation
- Testing
- 100% RT, hydrotest to 1.3× design, PMI on all SS
- TPI
- TÜV / BVIS stage inspections
Site record [PLACEHOLDER — replace with project photography]
Next project
Airport Terminal Roof Structure
A PROJECT LIKE THIS ON YOUR BOOKS? →
Request a Quote
Estimation team replies in 2 business days