Infrastructure · Visakhapatnam, Andhra Pradesh · 2025–26
Airport Terminal Roof Structure
L&T Construction [PLACEHOLDER]
Challenge
84 m clear-span trusses, each 118 T after pre-dressing, lifted over a partially built terminal with tandem cranes on a deck with strict ground-bearing limits.
Approach
Trusses ground-assembled on jigs with camber verified by total station, pre-dressed with purlins and walkways, then set in engineered tandem lifts with load-share monitoring.
Result
Seven trusses erected to date; camber survey on every set truss within 8 mm of theoretical. Completion scheduled Q2 2026.
Spec Sheet
- Scope
- Fabrication + erection of long-span roof trusses
- Tonnage
- 2,900 MT
- Spans
- 84 m clear, 12 primary trusses
- Contract type
- Subcontract to EPC
- Key equipment
- 2 × 400 T crawlers in tandem, strand jacks
- Status
- Erection in progress — 7 of 12 trusses set
Site record [PLACEHOLDER — replace with project photography]
Next project
ESP & Duct Revamp — Thermal Station
A PROJECT LIKE THIS ON YOUR BOOKS? →
Request a Quote
Estimation team replies in 2 business days